Grading & Blasting: Once cleared, land is stripped of topsoil and graded for a consistent work surface. Blasting is also used when necessary to aid grading.
KP 610.7 to 690.64: 02/24/18-06/31/18.
KP 690.64 to 764.56: 08/01/18-11/30/18.