Grading & Blasting
Grading & Blasting: Once cleared, land is stripped of topsoil and graded for a consistent work surface. Blasting is also used when necessary to aid grading.
Thompson River to Blackpines: 08/06/18-10/01/18
Thompson River to Nicola River: 09/17/18-01/09/19
KP 920 to 963.2: 09/10/18-11/24/18.
KP 963.2 to 987.6: 05/27/19-07/17/19.