Welding, Lower‑ins, & Tie‑ins at kilometers 525.58‑610.7
Weld, Lower-in, Tie-in: Once bending is complete, pipeline sections are welded together (weld). Welded pipeline is lowered into trench. Tie-ins are any final welding steps.
KP 525.58 to 610.7: 06/15/18-01/31/19.